A host server at Sydney Equinix is currently reporting a failing component. This will require the server to be taken off-power for a period to allow installation of a replacement.
The standard time allocation for the replacement is 15 minutes, but the remote hands people at DP are quoting an hour. We're arguing the point.
This work is now scheduled for 11:30AM, today with an expected maximum downtime of 45 minutes.
All work was completed at 11:55AM.